Brisay generating station

In this article, we will thoroughly explore the topic of Brisay generating station and how it has impacted different aspects of society. From its emergence to its evolution over time, Brisay generating station has been the subject of debate and controversy, but it has also been a source of inspiration and change. We will analyze its influence on culture, politics, economics and other areas, as well as its role in the formation of identity and community. Through a multidisciplinary approach, we will examine the various perspectives that exist on Brisay generating station, seeking to understand its scope and meaning in the current context. Likewise, we will examine whether Brisay generating station has a positive or negative impact on society and how it can be understood through different theoretical and methodological approaches. Ultimately, this article aims to provide a complete and balanced view of Brisay generating station, so that the reader can form an informed opinion on this topic.

Brisay generating station
Official nameCentrale Brisay
LocationBaie-James, Quebec, Canada
Coordinates54°26′30″N 70°31′50″W / 54.44167°N 70.53056°W / 54.44167; -70.53056
Opening date1993
Owner(s)Hydro-Québec
Reservoir
CreatesCaniapiscau Reservoir
Surface area4,275 km2 (1,651 sq mi)
Power Station
Hydraulic head37.5 m (123 ft)
Turbines2 × 234.5 MW (Kaplan turbine)
Installed capacity469 MW
Hydro-Québec, The La Grande Complex visitor booklet, 2004, ISBN 2-550-41276-1

The Brisay hydroelectric generating station is on the Caniapiscau Reservoir, in the Canadian province of Quebec. Part of Hydro-Québec's James Bay Project, the station can generate 469 MW.[citation needed] It was commissioned in 1993. It generates electricity through the reservoir and dam system.

References

  1. ^ Halliday, Matthew (2022-10-11). "Inside Hydro-Québec's Billion-Dollar Power Struggle". Canadian Business – How to Do Business Better. Retrieved 2024-02-20.